Water Ingress Remediation

Category
Building Maintenance
About This Project

The scope of works comprised of opening up the cavity wall to investigate water ingress that was seeping into the property’s hallway. The result of this investigation was to install new stepped cavity trays.

The works included cutting & breaking away the existing render with use of a Hilti hammer-drill, breaking out the blockwork and removing the existing insulation to inspect the cavity.

The remedial method used was installing new stepped cavity trays. The insulation was then reinstated and the block built again before plastering over it to leave a finished look.