Creation of Floor Openings

Category
Interior Demolition
About This Project

Awarded by McAleer & Rushe to create various floor apertures to provide access between levels throughout the building.

The makeup of the floor included a 300mm thick RC slab with a layer of screed on top. To complete the breaking out works we used Hilti TE3000’s.

A scaffold crash deck was erected in the basement before the works commenced, to provide a safe system of work.

back to projects